Use Case · Manufacturing

Production Planning
& Order Control

Automatic scheduling, optimised machine allocation and real-time sequencing. Orders that steer themselves through the shop floor, with less changeover time and higher on-time delivery.

Why Production Planning Is a Lever

The plan is out of date by morning, yet nobody replans

Production planning in mid-market manufacturing often works like this: an experienced planner creates the weekly schedule in a spreadsheet or in ERP.

He knows the machines, the changeover times, the bottlenecks. He knows which order has priority and which customer will complain. The problem: his knowledge is in his head, not in the system.

Monday 7am: machine 3 breaks down. Material for order 4711 has not been delivered. A customer calls wanting their order brought forward. The Friday plan is obsolete, but nobody replans systematically. Instead: phone calls, sticky notes, verbal agreements. The shop floor supervisor becomes a firefighter rather than a planner.

Typical consequence: 60-75% on-time delivery (instead of 90%+). Machines standing idle because changeover sequences are not optimised. Rush orders destroying the entire schedule. And nobody can tell sales when the next order will actually be ready, because nobody knows the current status.

How the Process Changes

Before / After

⏱ Before — Spreadsheets & Experience
Order received
From ERP, by email, by phone
Planner creates weekly schedule
Spreadsheet, ERP, tribal knowledge
⏱ 4–8h per week
Schedule to shop floor
Printout, whiteboard, verbal
❌ Media break
Disruption occurs
Machine, material, rush order
🔄 Plan instantly obsolete
Supervisor improvises
Phone calls, agreements, sticky notes
❌ Firefighter instead of planner
Changeover sequence suboptimal
No algorithm, just experience
⏱ 20–40% unnecessary changeover
Sales asks: "When will it be ready?"
Nobody knows the current status
❌ No reliable answer
Delivery date missed
60–75% on-time delivery
📊 Customer dissatisfied
⚡ After — With Lunatec
Order received
Automatically pulled from ERP
⚡ Scheduled immediately
AI optimises allocation plan
Machines, changeovers, capacities
✅ Minutes instead of hours
Real-time planning board
Digital, visible to all
📊 Always current
Disruption occurs
AI replans automatically
⚡ In seconds, not hours
Changeover sequence optimised
Algorithm minimises changeover time
✅ 25% less changeover
Sales sees delivery date
Real-time, reliable
👤 Dependable answer
Delivery date met
90%+ on-time delivery
📊 Customer satisfied
65% on-time delivery 92% on-time delivery

Delivery dates met

The Solution in Detail

How We Automate Production Planning

01

Automatic Order Import & Scheduling

New orders are automatically pulled from ERP with all relevant data: bill of materials, operations, dates, priority. The AI agent schedules the order into the allocation plan, taking into account all capacities and dependencies.

SAP PP / Dynamics 365 integration. Automatic operation breakdown. Capacity check against current allocation. Scheduling with consideration of material availability.

02

Changeover Optimisation & Machine Allocation

The AI agent optimises the sequence of orders per machine to minimise changeover times. Similar orders are grouped, tool changes minimised, parallel processing enabled where possible.

🟢 Optimised – Minimal changeover, no bottleneck
🟠 Bottleneck – Capacity limit, prioritisation needed
🔴 Conflict – Delivery date at risk, escalation

03

Real-Time Replanning on Disruption

Machine breakdown, missing material, rush order: the AI agent replans automatically. The entire schedule is not discarded; only affected orders are rescheduled and re-optimised. Impact on delivery dates is visible immediately.

Event-based triggers from MES/shop floor data capture. What-if scenarios in seconds. Automatic notification on date changes. Prioritisation by customer importance and penalty clauses.

04

Real-Time Planning Board & Delivery Date Dashboard

Digital planning board for the shop floor, supervisors and sales. Current status per machine, per order, per customer. Sales can give customers a reliable delivery date at any time, based on real-time data.

Power App or MES dashboard. Gantt view per machine/line. Drill-down to individual order. KPIs: on-time delivery, machine utilisation, changeover proportion, throughput time.

UiPath
SAP PP / Dynamics 365
MES / BDE-System
Azure AI (Optimierung)
Power App (Plantafel)
Power BI (KPIs)
Results

What Production Planning Automation Typically Delivers

92%

On-time delivery
(previously 65%)

−25%

Less changeover
time

+15%

Higher machine
utilisation

Echtzeit

Delivery date
visibility

The greatest lever is not the planning itself but the automatic replanning on disruption. In a typical manufacturing operation, 3-5 unplanned events per day change the schedule.

You May Also Be Interested In

Related Use Cases

Production Planning

Material availability as critical input for production planning. No plan works without material.

35% higher on-time delivery
Quality Control

Goods receipt inspection as the first quality checkpoint. QC data feeds into supplier evaluation.

70% less documentation
Invoice Processing

Incoming invoices automatically matched against purchase orders and goods receipts. 3-way match.

Ready?

What is the on-time delivery rate in your production?

Let us look in 30 minutes at where the biggest planning breakdowns occur, and how automatic allocation optimisation and real-time replanning can improve your on-time delivery.

No sales pitch. Just an honest assessment.

120+ Clients.   100% Satisfaction.   7 months to Profitability.

WHAT YOU GET IN THE DISCOVERY CALL

Screenshot

Identify your best use cases
Based on your industry and process landscape

Screenshot

Calculate concrete ROI
In Euros, FTE equivalents and time savings

Screenshot

Show examples from your industry
Real results of comparable companies

Screenshot

Define timeline and next steps
Concrete roadmap, no vague promises