From digital application to commissioning: connection requests automatically validated, capacity calculated, contracts generated, works orders managed. Without media breaks.

Why Grid Connection Management Is a Lever

The energy transition is not failing on technology, it is failing on processes

Every solar installation, every EV charger, every new build and every heat pump needs a grid connection or feed-in approval. 

The number of applications has exploded in recent years, up 300-500% at many network operators driven by the energy transition. The teams have not grown to match.

In practice: an application arrives by email, post or portal. Data incomplete. Query raised. Wait. Data arrives. Capacity check, manually in the GIS and network calculation tool. Cost estimate. Quotation drafted. Customer accepts. Order created in the ERP. Civils contractor commissioned. Meter ordered. Per connection: 8-20 person-hours, spread over 4-12 weeks.

The consequence: months of waiting for customers. Installers and developers complain. Solar installations cannot connect because the paper process cannot keep up. And the regulator is pressing: connection regulations set statutory deadlines, and those deadlines are being missed with increasing frequency.

How the Process Changes

Before / After

⏱ Before — 6–12 Weeks
Application received
Email, post, portal, often incomplete
❌ 60% incomplete
Raise queries
Request missing data
🔄 1–3 weeks waiting
Capacity check
Manually in GIS and network modelling
⏱ 2–4h per application
Cost estimate
Spreadsheet-based, individual
⏱ 1–2h
Quotation & contract
Manually created and sent
Works management
Civils, meter, commissioning
❌ Manually coordinated
Commissioning
6–12 weeks after application
📊 Regulatory deadlines at risk
⚡ After — 2–4 Weeks
Digital application
Guided form, mandatory fields
✅ 95% complete first time
Automatic completeness check
Missing data requested immediately
⚡ Minutes instead of weeks
Automatic capacity check
GIS + network modelling integrated
✅ In seconds
Automatic cost estimate
Rule-based, consistent
⚡ Instant
Quotation auto-generated
Standard: instant. Complex: operator brief
✅ 70% straight-through
Works management automated
Civils, meter, scheduling coordinated
⚡ Automatic commissioning
Commissioning in 2–4 weeks
Regulatory deadlines met reliably
📊 60% faster
6–12 weeks 2–4 weeks

from application to commissioning (standard connection)

2–4 weeks (after) 6–12 weeks (before)
The Solution in Detail

How We Automate Grid Connection Management

01

Digital Application & Completeness Check

Guided online form for installers, developers and end customers. Mandatory fields, plausibility checks, document upload (site plan, installer credentials). AI checks completeness in seconds; missing documents are requested immediately.

Power App or web portal. Integration with installer register. Automatic address and plot validation. Document checking via AI. 95% complete applications first time, up from 40%.

02

Automatic Capacity Check & Costing

Connection data is automatically checked against GIS and the network modelling tool: is there capacity at the site? Is network reinforcement required? Cost estimate generated automatically based on the tariff rulebook, distance and connection capacity.

🟢 Standard – Capacity available, auto-quotation
🟠 Review needed – Reinforcement possible, operator checks
🔴 Constraint – Capacity limit, individual assessment

03

Automatic Contract Creation & Works Management

Quotation accepted: contract automatically generated and created in the ERP. Civils contractor automatically commissioned, meter ordered, commissioning date coordinated. No manual creation, nothing forgotten.

Integration with SAP IS-U, works management and contractor portals. Automatic scheduling. Status tracking for customer and installer. Escalation on delays.

04

Connection Dashboard & Monitoring

Overview: open applications, processing times, bottlenecks, regulatory deadline compliance. Drill-down to individual application. Capacity heatmap: where in the network is it getting tight?

Power BI dashboard. KPIs: cycle time, STP rate, query rate, regulatory deadline compliance. Capacity monitoring. Forecast: application volumes for coming months.

UiPath
SAP IS-U / CRM
GIS (Smallworld, ArcGIS)
Netzberechnungstool
Power App (Agenten-Oberfläche)
Power BI
Results

What Grid Connection Automation Typically Delivers

−60%

Faster
processing

−75%

Fewer
queries

100%

Regulatory deadline
compliance

70%

Straight-through
(standard connections)

The greatest lever is eliminating queries. 60% of incomplete applications, multiplied by 1-3 weeks of waiting per query, is the main driver of long cycle times.

You May Also Be Interested In

Related Use Cases

Grid Connection Management

New connections as a trigger for asset creation. Consistent master data from application through to maintenance.

60% faster processing
Regulatory Reporting

SAIDI/SAIFI data feeds into regulatory filings. Asset condition as the basis for investment reporting.

0 late filings
Maintenance (Manufacturing)

Same principles applied to production equipment. Predictive maintenance as a cross-sector capability.

40% fewer stoppages
Ready?

How many connection applications does your team process per month?

Let us look in 30 minutes at how a digital application process with automatic capacity checking can halve your cycle times and ensure regulatory compliance.

No sales pitch. Just an honest assessment.

120+ Clients.   100% Satisfaction.   7 months to Profitability.

WHAT YOU GET IN THE DISCOVERY CALL

Screenshot

Identify your best use cases
Based on your industry and process landscape

Screenshot

Calculate concrete ROI
In Euros, FTE equivalents and time savings

Screenshot

Show examples from your industry
Real results of comparable companies

Screenshot

Define timeline and next steps
Concrete roadmap, no vague promises